260 Spagnoli Road Melville NY 11747 USA

Remove Item

Are you sure you want to remove this item from your quote list?

Quote List

Loading…

Continue

Installation & Training

Step-by-step instructions and training videos for every Karp access door, roof hatch and floor door.

Installation instructions and training

Every Karp access door, roof hatch and floor door is designed to install without special tools, but the detail differs by model and by the surface it is going into — a fire-rated door in a shaft wall is not installed the same way as a drywall ceiling panel. The documents below cover each product family, and the training videos walk through the sequence step by step. Installing to these instructions is what keeps fire ratings, acoustic ratings and warranties valid.

Fire-rated doors: walls and ceilings

Standard installation procedure, plus a separate document for shaft wall assemblies. Use the shaft wall version wherever the door goes into a rated shaft; the sequence and fixings differ.

FG glass fiber reinforced gypsum ceiling doors

Includes the finishing sequence, since the panel is skimmed to match the ceiling.

KAD aluminum drywall access doors

Frame installation and the drywall bead detail.

KRHG and KRHA roof hatches

Curb installation, flashing and latching. Read this one before the roof deck is closed.

KST family: KSTC, KSTE and KSTDW

One document per surface type.

STC acoustical doors

Gasket seating is critical here. A poorly seated gasket loses the STC 64 performance the door was specified for.

KFD-SD WT floor doors

Includes the water-tight seal detail.

Before you start

  • Check the rough opening against the size table on the product page.
  • Openings differ by model; some are larger than the door size, some smaller. A duct door opening is 1 1/4 in. smaller than the door; a wall door is typically 3/8 to 1/2 in. larger.
  • Confirm the assembly. A fire-rated door carries its rating only when installed in the assembly it was tested in.
  • Keep the instructions with the handover documents. Facilities teams need them when the door is next serviced.

Do I follow the shaft wall instructions or the standard fire-rated instructions?

Use the shaft wall document whenever the door is being installed in a rated shaft wall assembly. The fixing pattern and the sequence differ from a standard rated wall.

Will a non-standard installation void the fire rating?

Yes. A fire-rated door carries its rating only when installed in the tested assembly, using the specified fixings and sequence. If the site condition does not match the instructions, call us before improvising.

Need help?

Call 631-768-8300 or email info@karpinc.com. If you can send the model number from the frame and a photo of the opening, we can usually resolve an installation question in one call.